Year | Autor | Titel |
2022-06 | F. Isedor | In-situ Coating of Welding Details at the Köhlbrandbridge with |
2022-04 | M. Arghand | Conception and preliminary desgin of a hall structure with circular plan |
2022-03 | E. Bulut | Conception and preliminary design of a 20-story office building employing a diagrid sturcture |
2022-01 | N. Finck | Conception and preliminary desgin of a hall structure with circular plan |
2022-01 | J. Kirschning | Thoughts on the Fabrication of Additive Manufactured Metal Multi Layers with a Collaborative Welding Robot |
2022-01 | Chr. Fintzen | Design of a Test Series for Fatigue Crack Growth according to ASTM E647 |