Selected projects

Status: 10.12.2024

List of selected laboratory projects see below

Selected projects with predominantly engineering services

No. Year Project Staff
       
176097 2024 Construction project "Expansion of port of Königs Wusterhausen" Alkateeb, Cerek
176096 2024 Investigation of damage to an excavation support consisting of diaphragm walls and a jet grouting base during the construction of the U4 underground railway line in Hamburg Heinrich, Toffoli
176095 2024 Construction project "Renovation of a historic mill in Jork with micropiles" - Finite Element Analysis Hagemann
176094 2022 Construction project "Ferry port in
Sassnitz-Mukran, Liegeplatz 3a, damage at cofferdam area" - damage assessment
Cerek, Hadjiloo
17609301 2022-2023 Construction project "Fernwärmeanbindung, Schlitzwandarbeiten Südschacht und Dichtungsblock" - Assessment of the subsoil, particularly with regard to the properties of the sand and gravel layers described in the construction report and in the geotechnical Kaminski, Bürkner
176092 2022-2023 Construction project "Offshore wind farm Kaskai" - Investigation of offshore vibratory pile driving for a monopile based on numerical simulation Hagemann
176091
17609101
2022-2023 Quay wall Salzgitterkai: shielding effect of the pile grid and the stability of the plastified king piles Vogel
176090 2022-2023 Expert opinion on the cause of interlocking in the segments L 21 and L 22 of the construction project "Flood protection Polder Hohe Schaar" Schröder, Komodromos, Alkateeb, Mayanja
176-0474 2021 Construction project "Reconstruction and extension of the Alster swimming pool" - assessment of foundation movements Vogel
176-0753 2021 Construction project "Demolition of Friesenbrücke" - statement on the drivability of the Z-piles and dolphins Beuße, Alkateeb
176087 2019-2020 Construction project "Überseequartier Hamburg" - investigation of quay wall deformations at Chicagokai and Magdeburger Hafen as a result of the Überseequartier construction pit Beuße, Kaminski
176085 2019-2022

Recalculation of the quay wall of the quay wall "Salzgitterkai" in Hamburg according to the Recalculation Guideline No. 4

Vogel
176084 2020-2022 Numerical simulation of the penetration of ship anchors into the seabed Dao
176083 2019-2022 Structural damage to a warehouse in Biskupiec/Poland Nguyen, Tinat
176080 2019-2022 Comparative expert opinion on landslide on the D8 motorway Stanford, Seitz, Bürkner, Stark
176079 2019-2022

Investigations into the causes and influencing factors of the low load-bearing capacity of the steel piles in the lower outer harbor of the SHW Niederfinow

Tinat, Alkateeb
176078 2018-2022 Nautic depth in port basins with fluid mud Nguyen, Stanford,
Somasundaram
176077 2017 Expert opinion in the legal dispute HSE ./. Arge Implenia/Michelbau  "Pipe jacking Transportsiel Isebek (TSI)" Milatz, Bubel
176074 2017-2019

Efficient compaction of dump soils using vibratory compaction - Numerical simulation and comparison with existing measurement data from the "measuring vibrator" test field

Sinduri, Nguyen
176073 2017 Coupled Eulerian-Lagrangin simulation of penetration of ship anchors in clay Sinduri
176072 2017 Expert opinion in the legal dispute HERO ./. Ditting Zobel
176071 2018 Scientific support of dynamic intensive soil compaction Chmelnizkij et al.
176-0546 2018 Load bearing behaviour predictions of a caisson in IJmuiden during lowring phase I and II Osthoff, Stapelfeldt
176-0478 2017 Monitoring of the heating of a railway switch Schuck
176070 2016

Expert opinion on the damage to the property Königsdamm 1 in Ratzeburg

Kocak, Heins, Chmelnizkij
176068 2015

Expertise on drilling methods in the course of the project "Neubau Schleuse Bolzum"

Osthoff, Bubel
176064 2015

Construction project "Dichtwand Hammer Straße" - Expertise on the investigation of the axial load-bearing behaviour of a sheet pile wall set in a sealing wall

Heins
176063 2015 Numerical simulation of the installation of vibratory and impact driven piles Chmelnizkij
176-0412 2014 FEM simulation of the impact driving considering soil-water interaction Heins
176061 2014 Construction proiject "Elbe-Havel-Kanal" - Investigation of interlockings at Los 8.3/7.1 Osthoff
176059 2014 Experimental and numerical investigation of the pile system MIDOS Carstensen
176055 2014

Numerical Investigation on coastal protection project "Nordstrand Alter Koog"

Kaya
215051 2014 Geotechnical preliminary design of a test dyke "ABz Wedel" Plenker
PG 2013 Technical evaluation of the planning services provided to date by TKB./GUD Bubel
PG 2013

Expertise on the evaluation of interlockings at "Niedersachsenbrücke"

Henke
176-0332 2012

Monitoring at the test fields "Todtglüsingen"

Milatz
176-0283 2011 Performance of Horizontal Dynamic Pile Tests (H-DPT) on four an vier large steel tube piles NN
176-0245 2012-2015 Construction project "Neubau Europäisches Hansemuseum" - Inclinometer measurements Osthoff
176048 2012-2013

Construction project "JadeWeserPort in Wilhelmshaven" - investigation of damage of sheetpile interlocks

Henke, Pucker, Pichler, Osthoff
176047 2012 Numerical simulation of the stabilization of slopes by means of doweling Kaya
176-0234 2011

FEM simulation of the lifting process of the lifting platform "Seabreeze" in connection with the bottom upgrade of the Container Terminal South

Qiu
176045 2011

Scientific support for field tests in a Nordsdee offshore wind farm

Siegl, Pucker
176044 2011

Preliminary study on the ship collision load case as part of the TAGU-BASE research proposal of the Ludwig Freytag Group

Hamann, Pichler
176042 2011-2014 Construction project "Rethebrücke in Hamburg" - Inclinometer measurements Pichler
176040 2011-2014

Investigations within the framework of the fundamental task "Formation of sealing connections in the area of ​​waterways"

Kaya
176039 2010

Construction project "Neubau der Ernst-August-Schleuse in Hamburg" - numerical investigations Investigations into the measured displacements of the outer head and the results of the inclinometer measurements

Henke
176037 2011-2012

Feasibility study on the use of geothermal energy at the Container Terminal Steinwerder in Hamburg

Menzel, Schuck
176035 2010-2011

Scientific monitoring of pile load tests using the Osterberg cell

Busch, Qiu, Hamann, Albrecht
176034 2009-2010

Construction project "Großkraftwerk Mannheim (GKM)" - expert opinion on the deformations that occurred during the installation of the sheet pile wall along the north bank of the harbour basin 21, new building block 9

Hamann, Kinzler
176033 2009-2011

Optimization of the manufacturing costs of the Hamburg quay cross-section using the example of "Predöhlkai, 2. Liegeplatz"

Pucker
176032 2009-2011

Use of METHA material as dam construction material - basic principles and practical applications

Beyer
176030 2010-2011

Expert opinion on the cause of the roadway damage at the Burchardkai Container Terminal from a soil mechanics perspective

Beyer u.a.
176029 2009

Construction project "Adjustment of the switch dolphins of the Kiel Canal Ostermoor and Dükerswisch - Geotechnical report

Dührkop, Albrecht
176026 2009

Numerical investigations into a possible influence of the existing "Rethebrücke" by piling driving during the construction of the neighbouring "Retheklappbrücke"

Henke
XYZ 2007

Scientific monitoring of the driving of prefabricated piles in the Port of Hamburg

König
PG 2010

Addendum of the "ARGE JadeWeserPort" on the dismantling of the fender panels of the Niedersachsenbrücke in Wilhelmshaven - Geotechnical statement

Henke
176-0238 2010

Expert opinion on subsidence damage at Schwerin Castle

Pucker
176-0215 2010

Expertise on the stability of underwater slopes at the offshore wind park "Global Tech I"

Stanford, Rudolph, Bubel
176-02111 2010-2011

Construction project "Ausbau Predöhlkai, 3. Liegeplatz" - advanced analysis of field measurements

Schallück
176023 2009

Construction project "Streckenertüchtigung Blankenberg-Warnow" - Investigation of the causes of the deformations that occurred

Henke
176020 2009

Construction project "Ausbau Predöhlkai, 3. Liegeplatz" - construction-related measurement program

Kinzler et al.
PG 2010

Court report "Stadtbahn  Hannover"

Bubel
176018 2010 Investigation of the Vertical Shaft Maschine (VSM) Henke
176-0195 2009

Calculation of the cutting penetration depth of a caisson for the "Köhlbrandhöft-Süd" sewage treatment plant

Henke
PG 2009 Construction project "City-Tunnel, Los C in Leipzig" - expert opinion on the pulling of sheet pile walls Henke
176016 2008

Construction project "Neubau einer Hochdruckhydrierungsanlage, Sasol Wax GmbH Hamburg" - report on Horizontal Dynamic Pile Test (H-DPT)

Dührkop
176017-01 2007-2009

Investigation program for the full displacement pile system FDP with lost bit

Busch
176015 2007

Investigation program for estimating the influence area of ​​tamping work in track construction

Schümann et al.
176-0135 2007 Construction project "Alstertor" - Inclinometer measurements Albrecht
176-0112 2007

Construction project on the area "Norddeutsche Raffinerie / DMS"

Albrecht
176-0108 2006 Vibration measurements Wendt
176-0086 2006

Report on the design and load-bearing capacity development of Centrum-piles at Flightline Hall, Deutsche Airbus, Hamburg

König
176-00701  

Award procedure for the JadeWeserPort deep-water container port - construction of the infrastructure, Baulos 1, supplementary offer NA 4 of the bidding consortium

Stanford, Henke, Kinzler
176012 2006-2007

Transient FEM simulation of groundwater flow at Containerterminal CT IIIa Bremerhaven

Ma, Möller
176010 2006

Expert opinion on the statement of claim against Obermeyer Planen + Bauen Spezialtiefbau GmbH in the matter of "Second case of damage during the first dam renovation of the eastern span in Nördlingen"

Stanford
176006 2005-2006

Transient FEM simulation of groundwater flow at Containerterminal CT IIIa Bremerhaven

Möller, Ma
176-0071 2005-2006

Report on the stability of a retaining wall in Lauenburg / Elbe

Kinzler
176-0019 2005 Construction project "Hamburg Große Bleichen" - Inclinometer measurements Kinzler
PG 2005 Sheetpile wall manual "Calculation" Kinzler et al.
TH-150-03 2003 Short export opnion "Crack damage to a former mill in Meckelfeld" Mardfeldft
TH-113-03 2005 Legal dispute DB Netz ./. Stadtwerke Elmshorn Mardfeldt
TH-113-03 2005 Construction project "BAB 20 Lübeck-Rostock - Teilstrecke 2 - Statement on vibratory compaction in sections BW 2.02, 2.05 and 2.12 Mahutka
TH-9206 2004-2006

Construction project "Schleuse Lauenburg" - Inclinometer measurements

König
TH-7706 2003

Numerical calculations for different geometries of underwater slopes by means of the Finite Element Method

Kelm
TUHH 2003-2004

Numerical simulation of the deformation behaviour of the quay wall at Container Terminal Altenwerder in the serviceability state

Mardfeldt
TH-61-03 2003-2004 Construction project "Hamburg-Rolandsbrücke" - Inclinometer measurements König
TH-192-02 2002 Construction project "Airport S-Bahn BA 5.2 and 5.3, Masse-Feder-System" - expert opinion Grabe
TH-085-02 2002 Literature and internet research on "Production of horizontal foundation elements in water" Mardfeldt
TH-077-02 2002

Literature and internet research on "Construction of quay wall sections"

Mardfeldt
TH-047-02 2002 Construction project "CIM Hamburg" - Inclinometer measurements Bürkner
TH-013-02 2002 Construction project "Ersatzneubau der Schleuse Lauenburg" - monitoring of the installation of a test diaphragmn wall Mardfeldt
TH-011-02 2002 Construction project "PSV Sportplatz Rostock" - Suitability test on GEWI permanent anchors Kelm
TH-138-01 1001-2002 Construction project "Staatsoper Hamburg" - Inclinometer measurements Bürkner
TH-121-01 2001 Expert opninion on the compaction of METHA silt Bürkner
TH-076-07 2001 Construction project "elbberg campus @ltona, Kaistraße" - expert opinion Luber, Kelm, Stein, Bürkner
TH-076-01 2001 Construction project "Sielkreizungsbaugrube Ankelmannsplatz" - photo documentation of jet grouting Stein
TH-054-01 2001 Construction project "Citti Hamburg" - suitability tests on permanent anchors Kelm
TH-9104 2000-2001

Construction project "Umschließung des Mühlenberger Lochs - Ground engineering statement on the foundation of the edge dam with geosynthetic-coated sand columns

Luber
TH-9103 1999

Accompanying a LIB pilot project for the remediation of the "AK-Chemie Biebesheim" site

Luber
TH-9102 1999 Fundamental investigation of jet grouting Stein
       

Selected larger laboratory projects

176001 2017 Construction project "Fehmarnsundquerung" - investigation of variants Laboratory
176001 2017 Construction project "Rader Hochbrücke" - Laboratory tests Laboratory
176001 2017 Construction project "Deponie Krems" - Laboratory tests Laboratory
176001 2016 Construction project "Danish offshore wind park" - Laboratory tests Laboratory
176001 2016 Construction project "Offshore wind park Lubmin" - Laboratory tests Laboratory
176001 2016 Construction project  "Brackel Verdichterstation" - Laboratory tests Laboratory
176001 2016 Construction project "Deponie Schwissel" - Laboratory tests Laboratory
176001 2016 Construction project "Erweiterung Europakai Cuxhaven" - Laboratory tests Laboratory
176001 2016-2022 Construction project "Fehmarnbeltquerung" - Laboratory tests Laboratory
176001 2015 Construction project "KVB Köln" - Laboratory tests Laboratory
176001 2015 Construction project "Fehmarnbeltquerung" - Laboratory tests Laboratory
176001 2015 Construction project "Offshore wind park Lubmin" - Laboratory tests Laboratory
176001 2014 Laboratory tests Laboratory
176001 2013 Construction project "Polder Hohe Schaar" - Laboratory tests Laboratory
176001 2013 Construction project "Elbe rechts" - Laboratory tests Laboratory
176001 2012 Construction project "Umflut Schieder See" - Laboratory tests Laboratory

176001

2011 Construction project "Rethebrücke Hamburg" - Inclinometer measurements Laboratory
176001 2011 Construction project "Offshore wind park DanTysk Nordpassage" - Laboratory tests Laboratory
176001 2011 Constructionm project "Container Terminal Süd (CTS) Hamburg" - Laboratory tests Laboratory
176001 2011 Construction project "Offshore wind park Baltic2" - Laboratory tests Laboratory
176001 2011 Construction project "Offshore wind park Godewind II" - Laboratory tests Laboratory
176001 2011 Construction project "Offshore wind park Butendieck" - Laboratory tests Laboratory
XYZ 2010 Construction project "Offshore wind park GlobalTech 1" - Laboratory tests Laboratory
176001 2009 Construction project "Ausbau A7 Autobahndreieck Bordesholm" - Laboratory tests Laboratory
176001 2009 Construction project "Offshore wind park Butendiek" - Laboratory tests Laboratory
176001 2009 Construction project "Barkassenanbindung Neue Mitte, Hamburg Wilhelmsburg" - Laboratory tests Laboratory
176001 2009 Construction project "Container Terminal Tellerort Süd" - Laboratory tests Laboratory
176001 2009 Construction project "Offshore wind park DanTysk (main examination) - Laboratory tests Laboratory
176001 2008 Construction project "Offshore wind park Meerwind" - Laboratory tests Laboratory
176001 2008 Construction project "Kraftwerk Moorburg, Hamburg" - Laboratory tests Laboratory
176001 2008 Construction project "TITAN-Parc, Rumänien", Laboratory tests Laboratory
176001 2008 Construction project "Offshore wind park DanTysk (preliminary examination) - Laboratory tests Laboratory
176001 2008 Construction project "Kaianlage Kattwykhalbinsel, Hamburg" - Laboratory tests Laboratory
176001 2007 Construction project "Offshore wind park Arkona" - Laboratory tests Laboratory
176001 2006 Construction project "Dryanova Ash Disposal Site and Transport Facilities, Maritz East 1, Bulgarien" - Laboratory tests Laboratory
176001 2002 Construction project "DB-Bauabschnitt Stelle-Lüneburg" - Labopratory tests Laboratory